New Features
New user rights
100.160 - Contacts - Modification of additional addresses
New API methods
Tool_Pos_Waste_To_Zero - sets the waste of the selected project positions to 0, issues a warning message if the positions have already been booked or reserved.
Tool_Pos_Waste_To_Zero ("*") - Sets the waste of the selected project positions to 0, without warning messages
Tool_Prj_Recalculate - Recalculates all partlists in selected projects. Inventory bookings are created if necessary, manual changes are overwritten. Parameters, all boolean: 1. including archived projects, 2. including projects with inventory bookings, 3. new generation of all PPS data records, not just those that have not yet been processed
Various minor extensions / adjustments
- Generic XML import: alternative file storage on network directory instead of FTP server
- Script integration in project times list
- Placeholder "Item with extra charge" can process several parts list variables with respective system modules
- Project-related order picking with an additional flag for deactivating rounding up to entire warehouse lengths -> Suppress rounding up when creating the order
- Release "Exec_Script" for all columns of the service items and for the left column in the checklist
- New keyword on measurement sheets "DrawItemPic" - Loads standard article image as a thumbnail, it is based on max. 120x120 px scaled
- New program setting - stock movements - rounding of the posting quantity (decimal places)
- Inventory document -> Standard PP can be overwritten
- Item detail, images -> Button to open the network directory in which the item images are stored as a file
- Project-wide order picking - button for resetting items already ordered
- Extension of the program settings by 2 functions with which incorrect, old reservations, whose linked positions have been deleted in the meantime, can be removed from the database
- Order assistant - order picking -> document reference of the linked sales document added in notes
- Order assistant - supplier search
- Take over payments when converting the prject -> adjustable in program settings
- Changed: "Change measurement attributes" for several positions: Set statements based on the variables of the first position are ignored. They are carried out individually for each item after the changes have been registered.
- BOM logic added: '= _help_url' for references to general references and '= help_url {variable}' for auxiliary references for individual variables
- Optimizations input mask multi-position input:
- Skip locked cells - also backwards overwritten with Shift-TabHandling arrow up + arrow down (checks 20 rows in the specified direction to see whether a cell can be entered, otherwise the next cell in the current row)
- Shift + Pos1 jumps to the first cell in the current row, Shift + End to the last cell that can be entered in the current row
- Articles, XML export and import are supplemented by an additional option for transferring stock balance and inventory bookings. ATTENTION: When transferring inventory bookings, links to project documents / orders may be missing!